- 1991 Technical,
market and economic feasibility study of an industrial scale penicillin
plant in the Philippines.
- 1991 Technical,
market and economic feasibility study of a multi-purpose chemical synthesis
plant in the Philippines.
- 1991 11
technical profiles on the following industries on behalf of UNIDO:
- water filters
and replacement elements
- PVC sheeting
- melamine formaldehyde
laminates
- light aluminium
extrusions
- v belts for automotive
replacement markets
- rubber hoses
for automotive replacement markets
- lead recycling
- carbonless paper
- date dibis and
date honey
- spectacle frames
- pharmaceutical plant
- prefeasibility
study on argon production in Saudi Arabia.
- hazop assessment
and implementation at Exxon Chemicals, Fawley to Exxon Standards and
Codes of Practice.
- 1990 Feasibility
study on offshore platform modifications on behalf of Chevron.
- 1990 Feasibility
study on revamping offshore dehydration facilities on behalf of Shell
at Lowestoft.
- 1988-90
Technical, economic and market feasibility studies on behalf of the
World Bank:
- techno-economic
feasibility study for the restructuring of jute bag and carpet backing
Production at Abbstal Limited, Lagos, Nigeria.
- techno-economic
feasibility study on proposed expansion of a vegetable oil and soap
plant at Appiah-Menka Complex Limited, Ghana.
- technical feasibility
study on the proposed expansion of pyrotechniques foundry project
at Pyrotechniques Nigeria Limited, Lagos, Nigeria.
- techno-economic
feasibility study on pharmaceutical manufacturing plant for intravenous
infusion solutions and automatic packaging systems at Oron, Akwa and
Ibom State, Nigeria.
- technical survey
investigation at Aluminium Enterprises Limited, Ghana.
- sheet metalwork
at Datine Mercantile Limited, Nairobi, Kenya.
- paper packaging
at Highland Paper Mills, Eldoret, Kenya.
- PVC sheeting
and coatings at Sera Cratings Limited, Nairobi, Kenya.
- pharmaceuticals
at Pharmivoire Limited, Abidjan, Cote d'Ivoire.
- cardboard packaging
at Bucklips Packaging Limited, Aura, Ghana.
- latex rubber
gloves at Tulip Industries Limited, Abidjan, Cote d'Ivoire.
- 1988-90
BP Chemicals, Carshalton. Detail design and site supervision of:
- new
plant fire water system including pumps, ring main and deluge systems
all to BP Standards and Codes of Practice.
- new drum filling
facility and warehouse, roads, etc.
- ad hoc modification
to plant and process equipment.
- 1988-90
26 technical feasibility studies in China on behalf of the EEC.
- 1979-81
Previous experience with APV Company Limited, manufacturer of process plant
for petro-chemical industry. Production Engineering Manager responsible for
specialisation and justification of all new capital projects - design and
manufacture of tooling, planning and estimation work study. Research and
development of new processes including new electrophoretic painting plant
(patented).
- 1971-79
Initial training and experience as graduate trainee then Line Manager
with Ministry of Defence after winning MOD university scholarship.
Work in fabrication and assembly of Chieftain main battle tanks including
all aspects of production planning and scheduling.
|
 |